The Net is the Automation.
We bring people, systems and devices together.
NettedAutomation GmbH
Information & Communication Systems (NAICS)

back - menue - contact - search
news - solutions - standardization - seminars - marketing support
question & answers - discussion forum - glossary - links - about us


-> home > marketing support > SCC Publications >

..... we bring people together ....



Publications by Karlheinz Schwarz


Mr. Schwarz has published some 100 technical articles and held 100 seminars/lectures on distributed automation systems and communication subjects. He is known to be outstanding in the domain of open distributed automation and open communication systems.

See our latest dates for seminars on IEC 61850

List of an excerpt of publications:

1. Schwarz, K. Offene Verständigung in verteilten Systemen der industriellen Automatisierung Automatisierungstechnische Praxis atp 31 (1989) l, S.23 – 29, R. Oldenburg Verlag.

2. Schwarz, K. Manufacturing Message Specification (MMS) - Offene Verständigung in verteiIten Systemen der industriellen Automatisierung, Automatisierungstechnische Praxis (atp) München, Januar 1989, Seiten 23 – 29.

3. Lederhofer, A.; Schwarz, K. Open Systems Protocols and Specification, CNMA Overview Proceedings of the Open Communication Congress, 4 bis 7 Sept. 1990. Stuttgart. Springer Verlag.

4. Schwarz, K. Manufacturing Message Specification, MAP Workshop, MMS and Applications, SYSTEC ´90, Munich, 24.10.90.

5. Schwarz, K. Fieldbus Communication - Another way to go. I&CS March, 1991, P. 49 – 51.

6. Schwarz, K. Manufacturing Message Specification (MMS) - Übersicht über die Methoden. Modelle, Objekte und Dienste, Automatisierungstechnische Praxis (atp). München. Juli 1991.

7. Schwarz, K. Manufacturing Message Specification (MMS); MMS-Informationsveranstaltung des NAM/DIN; Juni 1991.

8. Schwarz, K. Prüfen und Zertifizieren von Profibus-Produkten, Der Konstrukteur, vtw-Verlag, 10/91.

9. Schwarz, K. Profibus im Prüfungsstreß, Konstruktion und Elektronik, Verlag Moderne Industrie, 25/91.

10. Indefrey, K.; Schwarz, K. Manufacturing Message Specification (MMS) in Siemens Automatisierungs-Systemen. Sinec Technologische-Funktionen (STF), Automatisierungstechnische Praxis (atp), München, Dezember 1991, Seiten 633 – 637.

11. Schwarz, K. MMS - vom Standard zur Anwendung, Status, Situation, Aufgabe und Nutzen, Elektronik Heft 25/91, Franzis Verlag München, Seiten 56 – 63.

12. Schwarz, K. Bridging MAP to Ethernet, I&CS, November 1991, Seiten 57 – 62.

13. Schwarz, K. Standardisierung der Kommunikationssprache MMS - ZVEI-Arbeitsgemeinschaft am Erfolg maßgeblich beteiligt, Automatisierungstechnische Praxis (atp). München. Juni 1991, S. 319 – 321.

14. Schwarz, K. Lichtblick im Normungsdschungel - Situation der internationalen Standardisierung am Beispiel der industriellen Kommunikation, ELEKTRONIK Heft 8/92, Franzis Verlag München, Seiten 50 – 56.

15. Pfeifer, T., Schwarz, K. u.a. Profibus-Testverfahren und Werkzeuge, Maßnahmen für Qualitätssicherung und Zertifizierung in der PNO, VDI-Verlag Düsseldorf, 1992, S. 203 – 215.

16. Eickmeier, R..; Schwarz, K.. Wohin geht die industrielle Kommunikation? Hierarchien von ASI bis OSI - Wunsch oder Notwendigkeit?, VDI Berichte Nr. 1123, Düsseldorf, 1994, Seiten 7 – 18.

17. Schwarz, K. Industriestandards - Ergänzung oder Ersatz internationaler Normen?, VDI Berichte Nr. 1123, Düsseldorf, 1994, Seiten 33 – 44.

18. Schwarz, K. Datenkommunikation in automatisierten Systemen, GMA-Information 3/94, atp-Automatisierungstechnische Praxis 36 (1994) 10, Oldenbourg Verlag München, Seiten 7 – 8.

19. Schwarz, K. Genormte Schnittstellen in der Automatisierungstechnik, STEP und MMS - zwei Säulen zur Kostensenkung, Systeme Heft 5/94, Franzis Verlag München, Seiten 37 – 42.

20. Schwarz, K. Die eigensichere Variante - PROFIBUS in der Verfahrenstechnik, ELEKTRONIK 14, Franzis Verlag München, 11.6.95, Seiten 48 – 58.

21. Schwarz, K. Der MAP/MMS-Markt - Energieversorger entscheiden sich für Standard-Schnittstellen, ELEKTRONIK 19, Franzis Verlag Poing, 19.09.95, Seiten 24 und 28.

22. Schwarz, K. Versorgungsunternehmen setzen auf offene Kommunikationsplattformen 11/95, atp - Automatisierungstechnische Praxis 37 (1995) 11, Oldenbourg Verlag München, Seiten 32 – 39.

23. Schwarz, K. Manufacturing Message Specification (MMS) - Basic Ideas, The First European Workshop and Exhibition on Power Systems Operation and Planning Tools presented by the Electric Power Research Institute (EPRI, Palo Alto, USA), Amsterdam, The Netherlands, October 22 – 27, 1995, 6 pages.

24. Schwarz, K. European Applications of Manufacturing Message Specification (MMS), The First European Workshop and Exhibition on Power Systems Operation and Planning Tools presented by the Electric Power Research Institute (EPRI, Palo Alto, USA), Amsterdam, The Netherlands, October 22 – 27, 1995, 8 pages.

25. Schwarz, K. Utility Communications Architecture (UCA) und die allgemeingültigen Protokolle nach IEC 870-6 (ISO and ITU) compatible protocols), GMA/DKE-Forum „Offene Kommunikationsplattformen für die Leittechnik“, INTERKAMA ‘95, Düsseldorf , 30. Oktober 1995, GMA-Bericht 27, Seiten 95 – 108.

26. Becker, Gerhard; Gärtner, W.; Kimpel, T.; Link, V.; März, W.; Schmitz, W.; Schwarz, K. Telecontrol Application Service Element Two (TASE.2), Seiten 35 –¬ 55; Offene Kommunikationsplattformen für die Leittechnik nach IEC 870-6 am Beispiel der Netzleittechnik, etz-Report 22, VDE-Verlag Berlin, 1996.

27. Schwarz, K. Internationale Normung – Der „User Layer“ überholt die sieben Kommunikationslayer, iNet ´96, Conference Proceedings, 18. – 20. Juni 1996, Karlsruhe, Seiten 11 – 18

28. Schwarz, K. Kommunikation Total – Von der Energieerzeugung über den Transport und die Verteilung bis zum Kunden, GMA-Kongress ´96 Mess- und Automatsierungstechnik, VDI Berichte 1282, Seiten 239 – 248, VDI Verlag, Düsseldorf 1996.

29. Schwarz, K. Der Normung der sieben Kommunkationsschichten folgen genormte Anwendungen, e&i, ÖVE-Verbandszeitschrift, Heft 5/1997, Seiten 236 – 240, Springer Verlag, Wien und New York.

30. März, W.; Schwarz, K. Powerful and open communication platforms for the operation of interconnected networks, ETG-Tage /IEEE PES Summer Meeting 1997, Proceedings, Berlin.

31. Schwarz, K. Standard-Schnittstelle IEC 60870-6 TASE.2 für Prozeßdatenkommunikation und SCADA-Aufgaben (Teil 1), 04/98, atp - Automatisierungstechnische Praxis 40 (1998) 4, Oldenbourg Verlag München, Seiten 32 – 45.

32. Schwarz, K. Standard-Schnittstelle IEC 60870-6 TASE.2 für Prozeßdatenkommunikation und SCADA-Aufgaben (Teil 2), 05/98, atp - Automatisierungstechnische Praxis 40 (1998) 5, Oldenbourg Verlag München, Seiten 57 – 62.

33. Becker, Gerhard; Gärtner, W.; Kimpel, T.; Link, V.; März, W.; Schmitz, W.; Schwarz, K. Telecontrol Application Service Element Two (TASE.2), Seiten 37 –¬ 63; Offene Kommunikationsplattformen für die Leittechnik nach IEC 870-6 am Beispiel der Netzleittechnik, etz-Report 22, VDE-Verlag Berlin, 1998.

34. Becker, Gerhard; Gärtner, W.; Kimpel, T.; Link, V.; März, W.; Schmitz, W.; Schwarz, K. MMS – Die Basis der TASE.2 (IEC 60870-6-503 und –802), Seiten 95 –¬123; Offene Kommunikationsplattformen für die Leittechnik nach IEC 870-6 am Beispiel der Netzleittechnik, etz-Report 22, VDE-Verlag Berlin, 1998.

35. Schwarz, K Produktion und Reduktion von Prozeßdaten durch Standard-Schnittstellen, Seiten 158 – 166; Herausforderung Geschäftsprozesse – Den Wandel organisatorisch und technisch gestalten, Logis-Verlag Stuttgart, 1998.

36. Schwarz, K. Telecontrol mit TASE.2 (IEC 60870-6), Offene Standards für die industrielle Automation, Informationsveranstaltung 17.11.1998, VDMA Frankfurt.

37. Schwarz, K. Projekt URTICA – Vernetzung der Netzleitstellen, Nutzung moderner Kommunikationsmittel der EVU, VDE-Verlag Berlin, 1999.

38. Schwarz, K. Endlich offen, Computer & Automation 2/99, Seiten 39 – 45, Weka Fachzeitschriften-Verlag Poing, 1999.

39. Schwarz, K. Telecontrol Standard IEC 60870-6 TASE.2 Globally adopted, Fieldbus Technology – Systems Integration, Networking, and Engineering, Pages 38 – 45, Springer Wien New York, 1999.

40. Schwarz, K. IEEE Utility Communications Architecture (UCA) applies mainstream standard Ethernet, Fieldbus Technology – Systems Integration, Networking, and Engineering, Pages 268 – 275, Springer Wien New York, 1999.

41. Schwarz, K. Das LAYER-7 Tohuwabohu, Computer & Automation 5/99, Seite 14, Weka Fachzeitschriften-Verlag Poing, 1999.

42. Becker, David L.; Becker, Gerhard; Gärtner, Kaib, Wolfgang; W.; Kimpel, V.; März, W.; Schmitz, W.; Schroeder, Robert; Schwarz, K. Telecontrol Application Service Element Two (TASE.2), Pages 23 – 45, Open Communication Plattforms for Telecontrol Applications – Benefits from the New Standard IEC 60870-6 TASE.2 (ICCP), etz-Report 32, VDE-Verlag Berlin, 1999.

43. Becker, David L.; Becker, Gerhard; Gärtner, Kaib, Wolfgang; W.; Kimpel, V.; März, W.; Schmitz, W.; Schroeder, Robert; Schwarz, K. The UCPTE Real Time Information Communication Architecture (URTICA), Pages 61 – 64, Open Communication Plattforms for Telecontrol Applications – Benefits from the New Standard IEC 60870-6 TASE.2 (ICCP), etz-Report 32, VDE-Verlag Berlin, 1999.

44. Becker, David L.; Becker, Gerhard; Gärtner, Kaib, Wolfgang; W.; Kimpel, V.; März, W.; Schmitz, W.; Schroeder, Robert; Schwarz, K. MMS – The Basis of the TASE.2 (IEC 60870-6-503 und –802), Pages 78 – 105, Open Communication Plattforms for Telecontrol Applications – Benefits from the New Standard IEC 60870-6 TASE.2 (ICCP), etz-Report 32, VDE-Verlag Berlin, 1999.

45. Schwarz, K. Der MAP-Ansatz, Computer & Automation 06/00, Seiten 54-47, Weka Fachzeitschriften-Verlag Poing, 2000.

46. Schwarz, K. Geschlossen, offen oder weit offen?, Computer & Automation 09/00, Seite 8, Weka Fachzeitschriften-Verlag Poing, 2000.

47. Schwarz, K. Seamless real-time information integration accross the utility enterprise to reduce costs, Pages 108-122, Volume II Conference proceedings 8th annual Power-Gen Asia, Bangkok, 20-22 September 2000. http://www.nettedautomation.com/download/PowerGenAsia_2000_06_20.PDF

48. Schwarz, K. IEEE UCA™ and IEC 61850 applied in digital substations, Conference proceedings DistribuTEC 2000, Vienna, 10-12 October 2000.

49. Schwarz, K. Ein gemeinsamer Nenner, Computer & Automation 02/02, 9 Seiten, Weka Fachzeitschriften-Verlag Poing, 2002.

50. Schwarz, K. Der Standard IEC 61850 für die durchgängige Kommunikation, VDE Kongress 2002 Fachtagungsberichte, 19 Seiten, VDE Verlag Berlin/Offenbach, 2002.

51. Schwarz, K. Wind Power Communication - Verification report and recommendation; Elforsk Rapport Number 2-14; Stockholm, April 2002. http://www.nettedautomation.com/download/02_14_rapport.pdf

52. Schwarz, K. Wind Power Communication - Design & Implementation of Test Environment for IEC61850/UCA2; Elforsk Rapport Number 2-16; Stockholm, April 2002. http://www.nettedautomation.com/download/02_16_rapport.pdf

53. Schwarz, K. Neue Normen für SCADA-Aufgaben – Offene Objektmodelle, Konfiguration und Kommunikation nach IEC 61850 und IEC 61400-25.

54. Schwarz, K. Offene Objektmodelle, Kommunikation und Konfiguration, SPS/IPC/Drivers 2003 Tagungsband, 15 Seiten, VDE Verlag Berlin, 2003.

55. Schwarz, K. Kapitel 18, Abkürzungen und Begriffe, Offene Kommunikation nach IEC 61850 für die Schutz- und Stationsleittechnik, etz-Report 34, Seiten 181-182, VDE Verlag Berlin, 2004.

56. Schwarz, K., Brunner, Cameron, Krug, Schubert, Zenner Kapitel 16, Schrittweise Modernisierung von Anlagen mit Produkten nach IEC 61850, Offene Kommunikation nach IEC 61850 für die Schutz- und Stationsleittechnik, etz-Report 34, Seiten 165-170, VDE Verlag Berlin, 2004.

57. Schwarz, K. Kapitel 15, Anwendungen und Erweiterungen von IEC 61850 in der dezentralen Energieversorgung und in anderen Bereichen, Offene Kommunikation nach IEC 61850 für die Schutz- und Stationsleittechnik, etz-Report 34, Seite 159-164, VDE-Verlag Berlin, 2004.

58. Schwarz, K. Kapitel 8, Abbildungen der Datenmodelle und der Kommunikationsdienste in den Teilen IEC 61850-8-1, 9-1 und 9-2, Offene Kommunikation nach IEC 61850 für die Schutz- und Stationsleittechnik, etz-Report 34, Seiten 115-122, VDE-Verlag Berlin, 2004.

59. Schwarz, K. Kapitel 7, Kommunikationsdienste nach IEC 61850-7-2, Offene Kommunikation nach IEC 61850 für die Schutz- und Stationsleittechnik, etz-Report 34, Seiten 85-112, VDE-Verlag Berlin, 2004.

60. Schwarz, K. Kapitel 4, Einleitung in die Modellierung und Kommunikation, Offene Kommunikation nach IEC 61850 für die Schutz- und Stationsleittechnik, etz-Report 34, Seiten 33-44, VDE-Verlag Berlin, 2004.

61. Schwarz, K. Vorwort, Offene Kommunikation nach IEC 61850 für die Schutz- und Stationsleittechnik, etz-Report 34, Seiten 5-6, VDE-Verlag Berlin, 2004.

62. Schwarz, K. The Standard Message Specification for Industrial Automation Systems - ISO 9506 (MMS), The Industrial Communication Technology, Handbook, Pages 36-1-36-32, Taylor & Francis Group, crcpress, 2005.

63. Schwarz, K. IEC 61850, IEC 61850 Basics and user-oriented project-examples for the IEC 61850 series for substation automation, Pages 24-25, 46, Vogel Industrie Medien, Würzburg, 2005.

64. Schwarz, K. Providing support, IEC 61850 Basics and user-oriented project-examples for the IEC 61850 series for substation automation, Pages 22-23, 46, Vogel Industrie Medien, Würzburg, 2005.

65. Schwarz, K., Wimmer, Dawidczak Substation Engineering, IEC 61850 Basics and user-oriented project-examples for the IEC 61850 series for substation automation, Pages 20-21, 33, Vogel Industrie Medien, Würzburg, 2005.

66. Schwarz, K. Information Exchange, IEC 61850 Basics and user-oriented project-examples for the IEC 61850 series for substation automation, Pages 14-19, Vogel Industrie Medien, Würzburg, 2005.

67. Schwarz, K. The data models, IEC 61850 Basics and user-oriented project-examples for the IEC 61850 series for substation automation, Pages 8-13, Vogel Industrie Medien, Würzburg, 2005.

68. Schwarz, K. The standard, IEC 61850 Basics and user-oriented project-examples for the IEC 61850 series for substation automation, Pages 6-7, 33, Vogel Industrie Medien, Würzburg, 2005.

69. Schwarz, K. IEC 61850, IEC 61850 Grundlagen und anwenderorientierte Projektbeispiele für die Normenreihe IEC 61850 zur Schaltanlagen-Automatisierung, Seiten 24-25, 46, Vogel Industrie Medien, Würzburg, 2005.

70. Schwarz, K. Unterstützende Maßnahmen, IEC 61850 Grundlagen und anwenderorientierte Projektbeispiele für die Normenreihe IEC 61850 zur Schaltanlagen-Automatisierung, Seiten 22-23, 52, Vogel Industrie Medien, Würzburg, 2005.

71. Schwarz, K., Wimmer, Dawidczak Das Engineering einer Schaltanlage, IEC 61850 Grundlagen und anwenderorientierte Projektbeispiele für die Normenreihe IEC 61850 zur Schaltanlagen-Automatisierung, Seiten 20-21, 33, Vogel Industrie Medien, Würzburg, 2005.

72. Schwarz, K. Informationsaustausch, IEC 61850 Grundlagen und anwenderorientierte Projektbeispiele für die Normenreihe IEC 61850 zur Schaltanlagen-Automatisierung, Seiten 14-19, Vogel Industrie Medien, Würzburg, 2005.

73. Schwarz, K. Die Datenmodelle, IEC 61850 Grundlagen und anwenderorientierte Projektbeispiele für die Normenreihe IEC 61850 zur Schaltanlagen-Automatisierung, Seiten 8-13, Vogel Industrie Medien, Würzburg, 2005.

74. Schwarz, K. Die Normenreihe, IEC 61850 Grundlagen und anwenderorientierte Projektbeispiele für die Normenreihe IEC 61850 zur Schaltanlagen-Automatisierung, Seiten 6-7, 33, Vogel Industrie Medien, Würzburg, 2005.

75. Schwarz, K. Smart Power Systems Rely on Standards for Information Models and Messaging - IEC 61850. The Industrial Information Technology Handbook. CRC Press, 2005

76. Schwarz, K. Impact of IEC 61850 on system engineering, tools, people ware, and the role of system engineering, DistribuTech 2007, San Diego (CA); 2-4 February 2007

77. Schwarz, K.; Praxis Profiline - IEC 61850: Use of IEC 61850 and MMS outside substations. Vogel Industrie Medien, Würzburg, 2007

78. Schwarz, K.; The application of IEC 61850 for wind power plants; Power Grid Europe, Madrid (Spain), 2007

79. Schwarz, K., Uslar, M.; Distributed Generation and Renewable Energy rely on Power and Information Grids; Power Grid Europe, Madrid (Spain), 2007

80. Schwarz, K.; Internationaler ETG-Kongress 2007: Mit genormten Webservice-Erweiterungen für die erfolgreiche Normenreihe IEC 61850 gegen die Vielfalt der Protokolle; VDE Verlag, Berlin, Offenbach, 2007, Heft 108

81. Krings, H., Schwarz, K.; Internationaler ETG-Kongress 2007: Die Normenreihen IEC 61970 (CIM) und IEC 61850 bilden eine wesentliche Grundlage für zukünftige Energieversorgungssysteme; VDE Verlag, Berlin, Offenbach, 2007, Heft 108

82. Schwarz, Karlheinz; Weiterentwicklung und Pflege der Normenreihen IEC 61850 und IEC 61400-25; FGH/BDEW Fachtagung: IEC 61850 in der Praxis: Anwendung, Erfahrungen, Ausblick; Heidelberg, 13. Mai 2008

83. Brunner, C, Schwarz, K.; Standardization of electric power delivery services – The Extensions to the IEC 61850 Edition 1; Praxis Profiline, Vogel Industrie Medien, Würzburg, August 2008

84. Schwarz, Karlheinz; IEC 61850 beyond Substations – The Standard for the whole Energy Supply System, CEPSI 2008, Macau; 27 October 2008

85. Schwarz, Karlheinz; Advanced Condition Monitoring of Primary Equipment with the Standard Series IEC 61850 AND IEC 61400-25; CEPSI 2008, Macau; 31 October 2008

86. Schwarz, Karlheinz; IEC 61850 und IEC 61499 – Als Basis für die intelligente verteilte Automatisierung in elektrischen Energieversorgungssystemen; Internationaler ETG-Kongress 2009 (ETG-FB 118); Düsseldorf, 2009; VDE Verlag
http://www.vde-verlag.de/data/prcd.php?docid=453194044&loc=de

87. Schwarz, Karlheinz; et al     Ergebnisse der Untersuchung des Normungsumfeldes des e-Energy Förderprogrammes; Internationaler ETG-Kongress 2009 (ETG-FB 118); Düsseldorf, 2009; VDE Verlag
http://www.vde-verlag.de/data/prcd.php?docid=453194052&loc=de

Interested to get support in drafting your publication? Or ask us to write articles for you! Call us.

09.02.2010


The Net is the Automation.
© 2000-2002 NettedAutomation
composed by JohnBlack '01

back - menue - contact - search
news - solutions - standardization - seminars - marketing support
question & answers - discussion forum - glossary - links - about us