| Modul |
Topic |
Title / description |
0. General
|
| Prep |
Get prepared in some crucial topics in order to run the courses more efficiently |
In preparation for the training we send selected material to all registered people some three weeks prior to the event. What is a model, a protocol, MMS, an interface, ASN.1, XML, ... Ethernet? |
| Q&A |
Question & Answers
examples ... |
All attendees are requested to provide questions some two weeks prior to the event. Questions will be answered and discussed during the course. |
| S-0000 |
Welcome and opening |
Welcome, opening, rall call, and IEC 61850 in brief |
| S-0001 |
Summary
|
Summary and next steps
|
1. Management and automation of the power system - basics
|
| S-0100 |
Power system automation basics |
Basics of power system information integration and automation covering control centers, substations, power generation, ...
|
| S-0101 |
Standardization
|
IEC activities related to power system standardization, IEC TC 57 and TC 88 activities, IEEE
|
| S-0102 |
System design and specification
|
Introduction to specification, availability considerations
|
| S-0103 |
System migration concepts |
Stepwise migration from existing systems to solutions compliant to standards, project and migration planning, ... |
| S-0104 |
Security
|
Secure communication (data on travel) and data stored (IEC 62351) |
| S-0105 |
System management
|
Revision control, asset management
|
| S-0106 |
Testing devices and systems |
Test coverage and steps towards system testing and simulation (from devices to systems) |
| 2. IEC 61850 (and IEC 61400-25) basics |
| S-0200 |
IEC 61850 series - overview |
Communication networks and systems in substations: general introduction on whole series |
| S-0201 |
IEC 61850 Application modeling principles |
Modeling protection, substation automation, other applications (Logical nodes, data and data attributes, function modeling, extension of the models, monitoring) |
| S-0202 |
IEC 61850-6 engineering process |
Engineering process using the configuration language |
| S-0203 |
Communication
|
Information exchange, ACSI, mappings
|
| S-0204 |
Implementation of IEC 61850 conformant devices and tools |
Device models, design of advanced IEDs, software and hardware architectures, OEM software |
| S-0205 |
Device conformance testing
|
Conformance testing of devicesaccooding to IEC 1850-710
|
| S-0206 |
Extension rules IEC 61850 |
The extension rules for Logical Nodes, Data, and Common Data Classes |
| S-0207 |
Substation configuration language (SCL)
|
System configuration language: basics and details; Engineering process and SCL, SCL object model, SCL syntax (IEC 61850-6 (SCL))
|
| 3. Substation automation and protection |
| S-0300 |
IEC 61850 modeling details
|
Modeling of protection, switchgear, metering and power quality equipment and other substation automation applications
|
| S-0301 |
Applying IEC 61850 for substation automation - use cases
|
Use cases from substation automation like measuring of current and voltage, protection, operating a switch, creation of a sequence of events
|
| S-0302 |
Product specifications for substation equipment
|
Implementation guideline IEC 61850-9-2 "LE", Product standard for switchgear with integrated IEC 61850 interface (IEC 62271-003)
|
| S-0303 |
Substation automation system architecture
|
Communication architecture and topology, device architecture, impact of new technologies
|
| S-0304 |
Substation to substation communication for protection and control
|
Interlocking between substations, listance protection, line differential protection, etc.
|
4. Power generation
|
| S-0400 |
Wind Power Plants |
Communications for monitoring and control of wind power plants - IEC 61400-25 |
| S-0401 |
Hydro power plants (introduction)
|
Communications for monitoring and control of hydro power plants - IEC 61850-7-410 |
| S-0402 |
Distributed Energy Resources
|
Communications for monitoring and control of Distributed Energy Resources (DER) - IEC 61850-7-420 |
| S-0403 |
Hydro power plants (comprehensive)
example course material ...
|
Communications for monitoring and control of hydro power plants - IEC 61850-7-410 |
| 5. Communication between field devices and system level and at system level |
| S-0500 |
Telecontrol protocols I |
Fundamentals of Telecontrol equipment and systems - Part IEC 60870-5-101 and Part IEC 60870-5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard profiles |
| S-0501 |
Telecontrol protocols II |
Fundamentals of DNP3 |
| S-0502 |
Substation to control center communication with IEC 61850 |
Fundamentals of the use of IEC 61850 between control centers and substations
|
| S-0503 |
Inter control center communication (ICCP) |
Fundamentals of the use of IEC 60870-6-TASE.2 (ICCP) |
| S-0504 |
Webservices |
Fundamentals of the definition of Webservices specified in IEC 61400-25-4 |
| S-0505 |
Comparison of protocols |
Detailed comparison of the protocol suites listed under S-50 to S-54
|
| 6. System level applications |
| S-0600 |
IEC 61970 / 61968 series |
Energy management system application program interface (EMS-API) / System interfaces for distribution management -- introduction |
| S-0601 |
IEC 61970-301 CIM |
Energy management system application program interface (EMS-API); focus on Part 301: Common Information Model (CIM) and harmonization with IEC 61850 |
| S-0602 |
Dynamic and static use of the CIM Model |
Component Interfaces for information exchange, use cases for the CIM: GID, EAI, Network models |
| S-0603 |
Tooling for the Common Information Model CIM |
Available tools, platforms, experiences with power delivery systems. Overview of existing OS tools: CIMTool, Xpetal, CIMVT, CIMValidate, CIMSpy; Available commercial tools; Flaws and future tools |
| 7. Communication for SCADA and protocol implementations |
| S-0700 |
Extracting data from field devices
|
General SCADA services - configuration of logs and reports (IEC 61850-7-2)
|
| S-0701 |
Alarm handling
|
Fundamentals of special SCADA services (IEC 61850-7-2)
|
| S-0702 |
Communication technologies
|
Fundamentals of Industrial Ethernet used for substations and beyond
|
| S-0703 |
Information presentation and encoding
|
Fundamentals of UML, XML, ASN.1, ... |
| S-0704 |
Protocol basics
|
Fundamentals of ISO 9506 (MMS), Webservices, OPC XML DA, IEC 60870-5, DNP3
|
| S-0705 |
SCSMs (specific communication service mappings) for IEC 61850-7-2 |
Mappings to MMS, Webservices, OPC XML DA, IEC 60870-5, and DNP3 |
| S-0706 |
Demonstration of compliant software |
Demonstration of IEC 61850 compliant client and server software |
S-0707
(new) |
MMS client and server implementation - the basis for IEC 61850 |
Comprehensive training on the implementation of MMS clients and servers for all basic servcies required by IEC 61850-7-2 and TASE.2: Association, NamedVariable, NamedVariableList, Read, Write, Information Report, ... 1 to 3 day course |
S-0708
(new) |
ICCP (IEC 60870-6 TASE.2 Protocol) |
Use of MMS for realizing the TASE.2 services |
| 8. Products and projects |
| S-0800 |
Practical experience |
IEC 61850 devices, tools, and projects in reality; penetration of IEC 61850 (61400-25) in the market
|
| S-0801 |
Tool support
|
Tools supporting IEC 61850, SCL, IEC 61400-25, Ethernet, TCP/IP, MMS, ASN.1 |
| S-0802 |
User support
|
UCA international users group, quality measures and TISSUE process
|
| S-0803 |
Current and future standardization |
Introduction of current and future application domains using and extending IEC 61850; Update on ongoing and planned standardization activities |
| S-0804 |
SCL demo with compliant software |
Use of SCL files for building data model in an IED, extension of model (new data); including live demonstration |
| S-0805 |
Products offered by major vendors |
Market situation, what is the situatrion on the market? |
| S-0806 |
Multivendor projects and turn key projects of single vendor |
Experiences after two years substation automation and protection with IEC 61850; turn key projects, ... User’s view and requirements for the future. Are the users’ expectations met? |