Wind Power Communication
Verification report and recommendation

Elforsk rapport 02:14
April 2002

Summary

"The overall purpose of this document is to provide recommendations on do and don’ts regarding the use of IEC 61850/MMS and OPC as solutions for wind power plant communications. The report presents results from two test implementations. A version of the draft standard IEC 61850 based on the communication protocol MMS (ISO 9506) has been implemented and tested at a wind power plant in Sweden and a similar project for an OPC-interface has been conducted in Denmark....

Looking ahead the ongoing standardisation work within IEC TC88 Project Team 25 will solve most of the problems with MMS and OPC presented in the report. Similar to IEC 61850 the future wind power communication standard IEC 61400-25 will use the approach of separating the definition of information and services from the mappings to protocols. Thus, MMS, OPC and other solutions may be used to transfer the data."

Complete Report 02-14 [pdf 520 KB]


Wind Power Communication - Design & Implementation
of Test Environment for IEC61850/UCA2

Elforsk rapport 02:16
April 2002

Summary

A version of the draft standard IEC 61850 based on the communication protocol MMS (ISO 9506) has been implemented and tested at a wind power plant in Sweden and a similar project for an OPC-interface has been conducted in Denmark. Results and conclusions from the tests conducted in Sweden and in Denmark are documented in a separate Elforsk report, 02:14 “Wind power communications – Verification report and recommendation”. This report contains detailed descriptions on the implementation of IEC 61850/MMS in wind power plant at Gotland, Sweden. The purpose of the report is to present the technical solutions in the way of models, systems, software programs, and tools used. An important purpose is also that this material should be possible to use as basis for similar tests or pilot installations at other locations.

Complete Report 02-16 [pdf 3.1 MB]


The reports are also available at Elforsks web-page http://www.elforsk.se/ (order form in Swedish). The document can also be downloaded from that website."

Contact:

  • Anders Johnsson (co-editor of the report and Project Leader IEC TC 88 PT 25)
  • Karlheinz Schwarz (member of the IEC TC 88 PT 25 and chairman of the German mirror group of PT 25 - DKE AK 383.0.1).

Further information on PT 25.

14.08.2003


The Net is the Automation.
© 2000-2002 NettedAutomation
composed by JohnBlack '01

back - menue - contact - search
news - solutions - standardization - seminars - marketing support
question & answers - discussion forum - glossary - links - about us